Introduction

Auckland City Council is carrying out remediation and stabilisation works at Newmarket Park, Parnell.

Newmarket Park is a closed landfill with a southern slope that is prone to slips. The remediation works are being carried out to address ongoing public health and safety and environmental risks.

The works involve removing the existing vegetation on the southern slope, excavating then rebuilding the slope, then revegetating with native plants and trees.

Detailed ecological mitigation and landscaping plans for the site were consulted upon during 2009 and these plans are being implemented.

These works will take place over two earthworks seasons:

  • January to April 2010 and
  • October 2010 to April 2011.

As part of the works other areas of the park will be used for construction purposes.

Newmarket Park showing location of southern slope
Newmarket Park showing location of southern slope.
Sourced from Land Information New Zealand data. Crown Copyright Reserved


Project documents and plans

Please note: the documents and plans are all in PDF format.

Existing site plan (888kb PDF)

Typical failure types (95kb PDF)
Sections showing existing typical situations on southern slope.

Proposed remedial works site plan and staging (900kb PDF)
Plan showing proposed works area.

Proposed construction process (158kb PDF)
Typical sections of southern slope showing construction process to mitigate future slope failure.

Consultation presentation document (1337kb PDF)
Full details of the site, history of the park, project objectives and options, and more.


Updated January 2010